construction - implementing the plan
After the design and planning phase, construction can begin.
The following list represents some of the many steps involved from beginning to end.
- Stake addition location
- Clear lot as required
- Install erosion controls if necessary
- Excavate for foundation
- Footings and foundation walls
- Backfill foundation
- Rough framing
- Utility connections as required
- Roof
- Windows
- Rough mechanical system installation
- Concrete floors
- Insulation
- Drywall
- Exterior siding
- Flooring installation
- Cabinetry
- Interior millwork installation
- Interior painting
- Finish mechanical system installation
- Final grading
- Driveway installation if included
- Lawn and landscaping installation if included
- MOVE-IN